Whisby Redevelopment
- Whisby-6 well
- Wax removal workover to recover some 40 bopd
- Whisby-5 or Whisby-2 well (both shut-in)
- Sidetrack potential to access 0.5MMStb to 1.0MMStb of undrained STOIIP south of Whisby-6 well
- Wells to be surveyed to assess completion integrity
- Well planned as multiple sand penetration, with the well path planned to locate the OWC and plug back.
- Whisby-1 well
- Completion integrity survey to assess suitability for conversion into water injection well (replacing Whisby-2)