Whisby Redevelopment

  • Whisby-6 well
    • Wax removal workover to recover some 40 bopd
  • Whisby-5 or Whisby-2 well (both shut-in)
    • Sidetrack potential to access 0.5MMStb to 1.0MMStb of undrained STOIIP south of Whisby-6 well
    • Wells to be surveyed to assess completion integrity 
    • Well planned as multiple sand penetration, with the well path planned to locate the OWC and plug back.
  • Whisby-1 well
    • Completion integrity survey to assess suitability for conversion into water injection well (replacing Whisby-2)